Handed to me
First point of contact for any problem across five labs, and the product half: building internal software that makes the labs faster.
UL Solutions · Fremont, California · May – Aug 2026
I came back to UL as a product management intern, the first point of contact for five labs. The slowest thing I saw was a data review done by hand. So I built the checker that does the cross-checking.
| Plot | Band | Position | Gap mm | SAR 1g |
|---|
| Plot | Band | Position | Gap mm | SAR 1g |
|---|
Sample data, made up for this page. It is not the lab’s tool, its reports or its numbers. The real checker runs 13 checks on every plot page; the latest version, v21, runs 19.
Four parts, in the order they happened.
First point of contact for any problem across five labs, and the product half: building internal software that makes the labs faster.
Before a report went out, someone cross-checked every value against the master test table with Ctrl+F. About three days a review, roughly 180 engineer-hours a month.
A checker that reads each report against the master table, runs 13 checks per plot page (19 in the latest version) and flags what doesn’t match. Then a companion tool that matches positions as exact, likely or needs review.
down from about three days, across all five labs. People still do the review; they start from the flags.
Less visible, just as much of the work.
Honest limit: an internal tool, so the real one stays at the lab. Both times are approximate. Before this, I spent the summer of 2025 here running SAR tests.